saltar para conteúdo
Marcus Ritt
Ferramentas de Utilizador
Iniciar sessão
Ferramentas de Site
Pesquisar
Ferramentas
Mostrar página fonte
Revisões antigas
Backlinks
Alterações Recentes
Gestor de Media
Índice
Iniciar sessão
>
Alterações Recentes
Gestor de Media
Índice
Está em:
•
online_supplements
Barra Lateral
Índice
Início
Curriculum vitae
Ensino
INF 5010:
Otimização combinatória
INF 5016:
Algoritmos avançados
INF 5023:
Técnicas de busca heurística
.
Pesquisa
Publicações
Sintaxe desse Wiki
online_supplements
Esta é uma versão antiga do documento!
Online supplements
Gliesch, Ritt Moreira, "A genetic algorithm for fair land allocation", GECCO 2017
Supplementary material can be found
here
.
Silvestrin, Ritt, "An Iterated Tabu Search for the Multi-compartment Vehicle Routing Problem", Comp. Oper. Res., 81, 192-202, 2017
Supplementary material can be found
here
.
Zubaran, Ritt, "An effective heuristic algorithm for the partial shop scheduling problem", forthcoming
Supplementary material can be found
here
.
Ritt, Costa, Miralles, " The assembly line worker assignment and balancing problem with stochastic worker availability", Int. J. Prod. Res., 54(3), 907-922, 2016
Supplementary material can be found
here
.
Ritt, "A branch-and-bound algorithm with cyclic best-first search for the permutation flow shop scheduling problem", 2016 IEEE International Conference on Automation Science and Engineering (CASE), Fort Worth, TX, 2016, pp. 872-877.
Supplementary material can be found
here
.
Benavides, Ritt, "Two simple and effective heuristics for minimizing the makespan in non-permutation flow shops", Comp. Oper. Res., 66, 160-169, 2016
Supplementary material can be found
here
.
Ritt, Costa, "Improved integer programming models for simple assembly line balancing and related problems", Int. Trans. Oper. Res., 2015.
Supplementary material can be found
here
.
Benavides, Ritt, "Iterated Local Search Heuristics for Minimizing Total Completion Time in Permutation and Non-permutation Flow Shops", ICAPS 2015
Supplementary material can be found
here
.
Benavides, Ritt, "Flow shop scheduling with heterogeneous workers". Eur. J. Oper. Res., 273(2), 713-720, 2014.
Supplementary material can be found
here
.
Borba, Ritt, "A heuristic and a branch-and-bound algorithm for the assembly line worker assignment and balancing problem". Comput. Oper. Res., 45:87–96, May 2014.
Supplementary material can be found
here
.
online_supplements.1513106331.txt.gz
· Esta página foi modificada pela última vez em: 2017/12/12 17:18 por
marcus
Ferramentas de Página
Mostrar página fonte
Revisões antigas
Backlinks
Voltar ao topo